Banner
 
     
     
     
     
     
     
     
     
     
     
       
     
     
     
 

 

 

Brent Spence Bridge Conceptual Alternatives Study-Appendix
Appendix A - Level of Service and Traffic Data
  Alternative B 2035 AM PM Level of Service
  Alternative C 2035 AM PM Level of Service
  Alternative E 2035 AM PM Level of Service
Appendix B - Typical Sections
Appendix C - Engineering Files
Alternative D Geometric Plan and Profiles
  Alternative E Geometric Plan and Profiles
  Alternative G Geometric Plan and Profiles
  Alternative C,D, & E Profiles EZZARD
  Alternative B Line Diagram
  Alternative C Line Diagram
  Alternative D Line Diagram
  Alternative E Line Diagram
  Alternative G Line Diagram
  Alternative B Signs
  Alternative C Signs
  Alternative D Signs
  Alternative E Signs
  Alternative G Signs
  BSB Geometric Design
Appendix D - Cost Estimates
  Cost Estimates (2009)
  Estimated Real Estate Costs
Appendix E - Public Involvement
  Public Involvement Activities and Coordination
Appendix F - Previous Reports
  Existing and Future Conditions
  I-75 US-50 Origin-Destination Study
  Origin-Destination Report
  Planning Study Report
  Public Involvement Plan
  Purpose and Need
  Red Flag Summary
Appendix G - Utilities
  Utility Coordination
Appendix H - Constructability Workshop
  Constructability
   
           

Last Updated: 4/8/2010
© Copyright 2005-2006 PB. All rights reserved.